 |
 |
 |
|
Under stair cupboard doors |
Stair 13A socket chrome flush |
Stair moulding feature |
 |
 |
 |
|
Coving fixed and painted |
Wainscoting or tongue & groove wall panelling |
Garden log borders with bark chippings |
 |
 |
 |
|
Laminate flooring |
Concrete shed base |
Keter plastic shed erection |
|
 |
 |
 |
|
Decking tile installation. |
6 foot wooden fence panels erected. Cat fence installed. |
Outdoor tap installled on side of outhouse. |
|
 |
 |
 |
|
Plastic cupboard base on sloping ground with vermin
guard |
Skirting board installation. |
Stair cupboard doors opened to show shelving. |
|
 |
 |
 |
|
Outdoor waterproof mains socket installed on side of
outhouse. |
Plasterboarded and skimmed drylined. |
Wall mounted electric heater in garden room |
|
 |
 |
 |
|
Roller blind installation. |
Kitchen cupboard doors installed. |
Handrail installed and painted. Pictures mounted with
brackets. |
|
 |
 |
 |
|
Brass finish mains sockets installed. |
Dado rail inmstalled and painted. |
Airer dryer installed |
|
 |
 |
 |
|
Plasterboarded, skimmed and painted wall with window
feature. |
Ceiling fan installation. |
Wallpapering with skirting board installed and painted. |
|
 |
 |
 |
|
Curtain rail installed and painted. |
Loft hatch and ladder installer. |
Ceiling plaster skimmed and Victorian ceiling rose installed. |
|
 |
 |
 |
|
Wallpaper and dado rail fixed and painted. |
Architrave fixed, primed and painted. |
Loft attic hatch installation. |